STANHOPE GATE, LONDON ,W1 – MARCH 2016

 

Sector: Demolition Scope of Works:Producing a series of Vertical & Horizontal openings (In ground & basement floors) with depths ranging from 200mm Р2m deep in reinforced Concrete for Steel supports to enable facade retention.

Encountered Challenges:Heavy reinforcement. Drill bit life. Time scale

Provided Solutions:Working with our supplier to ensure we trialled manycompounds to find the optimum drill bit for this particular substrate. This saved on time & ensured the project was delivered as per the program.