ARC Shopping Centre

Sector: Demolition

Scope of Works: Removal of Reinforced Concrete Lift Shaft in LIVE shopping centre

Encountered challenges:  Water. Noise. Dust. Substrate removal

Provided Solutions: Guttering system designed for optimum water catchment.

Multiple AIR extraction units were used & Bespoke steel brackets were designed to assist in the removal of Concrete slabs.