Paddington, London- July 2016

 

Sector: Groundworks Scope of Works:  Producing a series of Vertical openings in heavily reinforced concrete to depths of 3m> to allow foundations to be drilled up to 35m deep for structural supports

Encountered Challenges: Heavy reinforcement. Drill bit life. Time scale

Provided Solutions: Working with our supplier to ensure we trialled many compounds to find the optimum drill bit for this particular substrate. This saved on time & ensured the project was delivered as per the program.